On-line Inspection Request

IMPORTANT: For successful inspection scheduling:

  1. Provide valid information in all required fields (required fields are indicated with asterisks (*).
  2. To schedule a subcontractor inspection, (such as plumbing, or electric, etc...) please use the corresponding subcontractor permit number.
  3. Ensure all required inspections have passed prior to scheduling the next inspection in a sequence (example... rough electric, plumbing and AC prior to a framing inspection).

Inspection Scheduling Hours: Monday - Friday 8:00 a.m. - 3:00 p.m.

Inspection requests will be accepted by the Building Department until 3:00 p.m. for the next business day.  Inspections requested after 3:00 p.m. will NOT be scheduled and a new inspection request will be required.  If an inspection needs to be canceled, notice must be given no later than 8:30 a.m. the day of inspection.

If the inspection is not scheduled for some reason you will be notified the next business day through the phone number or e-mail provided.

 

Requested Inspection Date
Inspections for next business day must be requested by 4 p.m.
We ask it because spam bots are too stupid to answer correctly, while humans are not.